Production of mortars with early initial strength for fixing dowels and anchors for load-bearing structures that require building authority approval.
For example:
Facade cladding
Roof elements
Scaffolding brackets
Stair stringers
Steps
suspended ceilings
Ceiling cladding
Railings
Handrails
Window sills
Sanitary facilities
Heating systems
Shelves, etc.
Manufacture of concrete and mortar for repairing concrete and reinforced concrete components in accordance with DIN 1045, which are not exposed to thermal stresses exceeding the usual natural climatic temperatures:
Pillars
Carriers
Support
Ceiling slabs
Wall panels
Concrete soles
Facade elements
Road surfaces
Runways
Tunnel components
All types of precast concrete elements, etc.
The early initial strength of the concrete or mortar allows moulds and formwork to be removed and precast elements to be transported after just 2 to 4 hours.
Production of fast-hardening concrete and mortar for laying work and fastening measures for:
Pipes
Rails
Rods
Posts
Supports
Gate brackets
Fence posts
Sign posts
Foundations
Wall and floor slabs
Pavement slabs, etc.
Production of floor screeds that can be walked on quickly in outdoor and wet areas.
The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage
Select
Result
The number of kg required
The number of units required for your project
The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage
Select
Result
The number of kg required
The number of units required for your project
The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage
Select
Result
The number of kg required
The number of units required for your project
The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage
Select
Result
The number of kg required
The number of units required for your project
The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage
Select
Result
The number of kg required
The number of units required for your project
The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage
Select
Result
The number of kg required
The number of units required for your project
The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage
Select
Result
The number of kg required
The number of units required for your project
The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage
Select
The calculator below will tell you how large an area a unit of the selected grout will cover, based on the dimensions that you supply. Simply enter the required figures in the boxes below and view the results in the results box. All tile and joint dimensions are rounded up to the nearest number (no decimal points).
Results
The number of kg required per square metre
On kg container is sufficient for:
m²
How many unit(s) will I need?
The number of units required for your project
The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage
Result
Required quantity in ml
The number of units required for your project
The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage
Select
Results
The number of kg required per square metre
On kg container is sufficient for:
m²
How many unit(s) will I need?
The number of units required for your project
The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage
Result
The number of kg required
The number of units required for your project
Quantity of chippings in kg
The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage
Select
Results
The number of kg required
The number of units required for your project
The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage